Short answer: Chinese New Year 2027 falls on Saturday, February 6, 2027; the official holiday runs about February 5–11, and factories and logistics across China slow down before and after it. For spring party supplies (St. Patrick’s Day and Easter), confirm your design and sample by November 25, 2026 so production starts by December 2 and goods ship from China by January 1, 2027. For summer (4th of July), request samples in January, approve artwork right after the holiday and confirm by March 11, 2027. If you miss a date, start from existing designs or ready stock.
Written by the export team at Damai Party, a party supplies manufacturer in Yiwu, China, since 2013. Dates match our 2027 party supplies ordering calendar. Updated November 2026.
2027 order deadlines around Chinese New Year
| Holiday (2027) | Confirm design & sample by | Production starts by | Ships from China by | Example in-store date |
|---|---|---|---|---|
| Valentine’s Day — Feb 14 | Passed (Oct 20, 2026) | — | — | Use existing designs or ready stock |
| St. Patrick’s Day — Mar 17 | Nov 25, 2026 | Dec 2, 2026 | Jan 1, 2027 | Feb 15, 2027 |
| Easter — Mar 28 | Nov 25, 2026 | Dec 2, 2026 | Jan 1, 2027 | Feb 15, 2027 |
| 4th of July — Jul 4 | Mar 11, 2027 | Mar 18, 2027 | Apr 17, 2027 | Jun 1, 2027 |
How the dates work: about 7 days from approval to production start, 25–30 days of production, then around 45 days for ocean freight, customs and distribution to the U.S. Replace the example in-store date with your own and count back the same way.
What happens to your order during Chinese New Year
- Before the holiday: factories, printers and material suppliers are at peak load as everyone ships before the break, and container space gets tight.
- During the holiday (about February 5–11, 2027): production and most logistics pause.
- After the holiday: lines restart gradually while workers return. We confirm the post-holiday production schedule for your order in writing with your quote.
Your plan, by situation
| If you… | Do this now |
|---|---|
| Need spring goods with your own artwork | Send artwork this week and approve the sample by November 25, 2026. Upload your design in our Custom Studio to see sample options and costs. |
| Need spring goods but artwork is not ready | Start from our existing designs: no new artwork to approve. Get free samples and check ready stock (designs marked “1 carton” can be ordered from 1 carton). |
| Are planning summer (4th of July, showers, birthdays) | Choose themes and request samples in December–January, approve artwork right after the holiday and confirm by March 11, 2027. |
| Are planning Mother’s Day, graduation or wedding season | Request samples before the holiday so you can approve as soon as factories restart; we confirm the schedule in writing. |
Checklist before the break
- Send your product list, quantities per design and in-store date.
- Get samples of existing designs (free; you pay the courier; about 7 days to ship).
- Approve artwork, packaging and barcodes in writing.
- Pay the 30% deposit so your order is in the production plan.
- Book your freight forwarder early; space before the holiday is limited.
Seasonal guides: Easter and spring 2027, Valentine’s and Galentine’s 2027, 4th of July and summer 2027, and the 2027 party theme trends.
Season guides after the holiday: graduation 2027 and bridal shower and bachelorette 2027.
Beat the Chinese New Year rush: pick your next step
Factory-direct in Yiwu since 2013 · amfori BSCI audited · Sedex · FSC-certified paper · food-contact test reports · Verify us → · WhatsApp +86 158 2575 5949
FAQ
When is Chinese New Year 2027?
Saturday, February 6, 2027. The official holiday runs about February 5–11, and factories and logistics in China slow down before and after it.
When should I order Easter 2027 party supplies from China?
Confirm your design and sample by November 25, 2026 so production starts by December 2 and goods ship by January 1, 2027, before Chinese New Year, reaching shelves around mid-February.
What if I miss the Chinese New Year deadline?
Start from existing designs, which need no new artwork approval, or order ready stock from 1 carton. For later dates, we confirm the post-holiday production schedule in writing with your quote.
How does Chinese New Year affect 4th of July orders?
Request samples in January and approve artwork right after the holiday. Confirm by March 11, 2027 for production to start by March 18 and goods to ship by April 17, reaching shelves around June 1.
Last reviewed: November 2026.
